Pular para o conteúdo

METODOLOGIAS PARA A INDUSTRIA 

  1. PDCA (Completo – 20 passos)
  2. A3
  3. 8D
  4. FMEA e FMECA
  5. HAZOP/HAZAN/PRA/QRA
  6. ROOT CAUSE FAILURE ANALYSIS
  7. FTA – FAULT TREE ANALYSIS 
  8. VSP – VALUE STREAM MAPPING
  9. VSD – VALUE STREAM DESIGN
  10. Projetos LEAN SIX SIGMA
  11. SPC – STATISTICAL PROCESS CONTROL
  12. SPA – STATISTICAL PROCESS ASSESSMENT
  13. MSA – MEASUREMENT SYSTEMS ANALYSIS
  14. APQP – ADVANCED PRODUCT QUALITY PLANNING
  15. PPAP (PRODUCTION PART APPROVAL PROCESS)
  16. CONTROL PLAN
  17. FLOW CHART
  18. CQI – CONTINUOUS QUALITY IMPROVEMENT – PROCEDIMENTOS PARA PROCESSOS ESPECIAIS
  19. MEDIÇÃO DO TRABALHO:
    • AMOSTRAGEM DO TRABALHO
    • AVALIAÇÃO DE DESEMPENHO
    • CRONOMETRAGEM BÁSICA
    • CRONOMETRAGEM CONFORME PADRÕES REFA
    • CONCESSÕES (TOLERÂNCIAS)
  20. MÉTODOS COM TEMPOS PRÉ-DETERMINADOS
    • MTM-1 – OPERAÇÕES MANUAIS
    • MTM-UAS – UNIVERSAL ANALYSING SYSTEM – OUTRAS OPERAÇÕES
    • MTM-LOG – APLICAÇÕES LOGÍSTICAS
    • MTM-MEK – PEQUENAS SÉRIES E MANUTENÇÃO
    • MOST – MAYNARD OPERATION SEQUENCE TECHNIQUE
  21. VOLUME DE TRABALHO ENTREGUE
    • CAPACIDADE
    • CARGA DE MÁQUINA
    • CARGA DE MÃO DE OBRA
    • BALANCEAMENTO DE LINHAS DE PRODUÇÃO
  22. DESIGN DO POSTO DE TRABALHO